/
Weekly Status Report_05/27/2016
Weekly Status Report_05/27/2016
Work this week
Effort %
Endpoint Engineering -
Test cases execution- 90%
Meetings -10 %
Endpoint Engineering –
- Execution of the manual test cases for image testing for windows 7, and windows 10.
- Patch testing for Windows 7 and windows 10 on Firefox and Internet Explorer.
- Patch testing for Mac OS on Firefox and Internet Explorer.
- Image Testing for Windows 7 and Windows 10.
See, Say, Set, Solve:
N/A
Planned for next week:
Endpoint Engineering –
- Execution of the manual test cases for image testing for MAC OS.
- Will continue with manual execution of patch testing test cases for windows 7 and windows 10.
- Will work on new projects assignments
, multiple selections available,